AQUA ORGWAN Resort under construction in Hurghada — the blocks in structure, with the pool foundations in the foreground
Under construction

Construction updates

AQUA ORGWAN is being built for handover in July 2028. Every stage is photographed on site and published here, so what you are buying can be followed month by month rather than taken on trust.

32

Internal walls plastered and bathroom walls tiled, with formwork in place for the pool-deck slabs. Photographs taken on site in October 2026.

11

Structural work continuing across the blocks, with pool foundations reinforced and internal walls plastered. Photographs taken on site in September 2026.

31

Blocks A to D under construction. Photographs taken on site in August 2026.

These are photographs of the site as it is, not visualisations. The renders elsewhere on this site show the finished design.